Proton detectionCertification Laboratory
National Service Hotline189-2646-0641
Choose Anteng and Believe in the Power of Professionalism
Contact Us
Official Hotline:189-2646-0641

Phone:189-2646-0641

Fax:0755-27724533

QQ:

Email:atjc01@antenglab.com

Address:深圳市龙华区大浪街道河背二路32号一方智谷工贸坊(1栋5楼)

The test report

What is a test report?

The so-called quality inspection report means that the safety and performance tests of products are successfully checked into other platforms such as Tmall and jingdong mall or supermarkets, or it can provide reference standards for consumers. Different platforms have formulated a series of strict requirements for quality inspection reports. GB national standard, industry standard and e-commerce standard have been formulated according to different products, industries and categories, so as to conduct quality assessment, make basic evaluation and analyze the reasons for qualified or unqualified quality

What is the purpose of the quality inspection report

1. Enterprise bidding

Apply for a government patent

Apply for government subsidies

4. Supervision by industrial and commercial departments

5. Filing of enterprise standards

6. Settle in jd, Tmall, taobao and other e-commerce platforms

7. Enter large supermarkets

Where to go for the quality inspection report

Product quality inspection report can comprehensively and objectively reflect the quality of the product information, usually by supply and demand both sides independent third-party professional quality inspection institutions, third party quality inspection professional inspection institution with relative independence, impartiality and authority, is qualified to social justice issued by data (inspection report).

How to handle the quality inspection report

1. Step 1: sample preparation, send samples that meet the test requirements.

2. Step 2: fill in the test application form, select the required test items, sign and send them to the laboratory together with the test samples.

Step 3: test the price confirmation

Step 4: test

Step 5: report

The cycle is generally 5-7 working days